Hydraulic Steel Efficient Coil Slitting Machine/Coil Slitting Line
The slitting machine is also called vertical slitting line which are used to slit cold rolled steel coil,hot rolled steel coil,galvanized steel coil,silicone steel coil,stainless steel coil,aluminum coils etc into different width according to the user’s production demands and cut as well The smaller metal strips are recoiled at the end of the slitting machine by which these smaller strips are used necessarily for the next process usage in the professional field of making transformers,motors making industry,tube/pipe welding mill industry,Cold roll forming industry, ceiling drywall industry and other high-precison equipment making and metal strips making industries. According to the material slitting thickness there are thin plate or board slitting machine,media-thickness plate or board slitting machine and thick plate or board slitting machine. According to the metal materials there are copper strips slitting machine,stainless steel slitting machine,cold or hot rolled plate slitting machine,silicone steel slitting machine.
Project
|
Parameter
|
|
Specification |
Material
|
HR, CR, GI
|
Thickness
|
0.6mm–4.0 mm
|
|
Width
|
400-1600mm
|
|
OD
ID |
φ800-2000mm
Φ508-610mm |
|
Weight
|
25 T
|
|
Performance
|
Yield strength 350MPa
Tensile strength 300MPa |
|
Slitting accuracy
|
Width tolerance:
Longitudinal tolerance Burr |
0.10mm
≤0.8mm/m ≤0.1mm |
Way of cutting
|
Feed cutting
|
|
Slitting strips |
0.6mm–1.5mm 25strips
1mm–2mm 20 strips 3.1mm–4mm 8 strips |
|
Strip width
|
Min 30mm
|
|
Recoiler diameter
|
Φ508mm/Φ610mm
|
|
Line Speed
|
80m/min
|
|
Operation height
|
1000mm
|
|
Total line power consumption
|
290kw
|
The production flow of equipment
Coil loading car—-Decoiler—-loop pit 1-center aligner—–slitting machine–waste scrap winder- loop pit
2–pre-separator–tensioner—pressing separator–recoiler–manual packing-Unloading coil car
1.How to maintain the machine?
Answer: add mechanical lubrication equipment to chain, bearing and cutting slide every month. Add mechanical lubrication to the case every half a year.
2. Do you sell only standard machines?
A: No, most of our machines are built according to customers specifications, using top brand name components.
3.How many workers to operate the machine?
A:Only 1-2 workers.
4. How to visit your company?
a.Fly to Beijing airport: By high speed train From Beijing Nan Station to Cangzhou West Station(1 hour), then we can pick you up .
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou West station(4.5 hours), then we can pick you up.
5. What can you do if the machine broken?
Our machine’s warranty period is 12months,if the broken parts can’t be repaired,we can send the new parts to replace the broken parts for free,but you need pay the express cost yourself.if over warranty period,we can for to solve the problems via negotiation,and we supply the technical support for the whole life of the equipment.
6.How can I trust you that machines pasted testing running before shipping?
A: 1) We record the testing video for your reference. Or,
2) Please visit company and test machine if convenient.