Standing Seam roll forming machine
Material of the cutting:Cr12Mov with quenched treatment.
It can decide cut panel dimension acoording to the hydraulic drive and PLC computer control system.
Material of the roller:High grade No.45 forged steel.
Roller station: 16 rows.
Thickness of feeding material:
0.3-0.8 mm
Programmable setting of profile length and quantity,Computed mode has two
modesautomatic and manual one.
Language:EnglishChineseSpanish
and Russian
The system is easy to operate and use
Power:4kw
Hydraulic oil: 46# hydraulic oil
Working pressure:12-16Mpa adjustable Solenoid valve:1 groups
Color:Blue(or as customer’s request).
Loading capacity:5T
Inner diameter:500-508mm Steel coil width:1300mm
Maxima out diameter:1250mm Coil placement in the coil holder: hydraulic hoist
Workingspeed:0-15m/minadjustable Main motor power:5.5KW AC motor
Main framework adopts welded steel and supported rollerused for transmit and collect the finished products.
Item |
Name |
Description |
1 |
Decoiler |
Capacity:5 tons |
2 |
Material |
Steel Coil |
3 |
Thickness |
0.5-1.2mm |
4 |
Transmission |
Chain/Gear/Gearbox |
5 |
Speed |
10-15m/min |
6 |
Roller |
Steel with quenched treatment,chromed on the surface |
7 |
Shaft |
steel with tempering treatment |
8 |
Cutting type |
Hydraulic cutting |
9 |
Cutting material |
Cr12 with quenched treatment Hardness58°-62° |
10 |
Welding |
Automatic spot welding |
11 |
Control system |
PLC |
12 |
Electric brand |
Delta,Siemens |
13 |
Voltage |
380V,50HZ,3PH(or as customers’ request |
1.How to maintain the machine?
Answer: add mechanical lubrication equipment to chain, bearing and cutting slide every month. Add mechanical lubrication to the case every half a year.
2. Do you sell only standard machines?
A: No, most of our machines are built according to customers specifications, using top brand name components.
3.How many workers to operate the machine?
A:Only 1-2 workers.
4. How to visit your company?
a.Fly to Beijing airport: By high speed train From Beijing Nan Station to Cangzhou West Station(1 hour), then we can pick you up .
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou West station(4.5 hours), then we can pick you up.
5. What can you do if the machine broken?
Our machine’s warranty period is 12months,if the broken parts can’t be repaired,we can send the new parts to replace the broken parts for free,but you need pay the express cost yourself.if over warranty period,we can for to solve the problems via negotiation,and we supply the technical support for the whole life of the equipment.
6.How can I trust you that machines pasted testing running before shipping?
A: 1) We record the testing video for your reference. Or,
2) Please visit company and test machine if convenient.